Job Done!
At 7:30 PM PDT with 76784.3 miles on the odometer all of the brake, bearing and paint work is finished! Here it is just back from a quick spin around the block.
Everything worked the first time as installed and no additional work or adjustment is necessary at this time and after I pack the bags it's time for a short 1,000 mile test ride.
The new parts include:
Chacal's stainless steel brake hoses and brake pipe from XJ4Ever.com.
HVC cycle's stainless steel brake pistons.
K&L brake caliper kits.
Yamaha bearings and seals, front and rear brake master cylinder kits.
Brake banjos from chevotalandcruiser on eBay.
NAPA copper brake banjo washers.
For the painted parts:
Flecto Varathane
Flood Penetrol
NAPA Crossfire CH254 alkyd hardener
Rustoleum Satin Black
Whew! What a ride!
.
At 7:30 PM PDT with 76784.3 miles on the odometer all of the brake, bearing and paint work is finished! Here it is just back from a quick spin around the block.
Everything worked the first time as installed and no additional work or adjustment is necessary at this time and after I pack the bags it's time for a short 1,000 mile test ride.
The new parts include:
Chacal's stainless steel brake hoses and brake pipe from XJ4Ever.com.
HVC cycle's stainless steel brake pistons.
K&L brake caliper kits.
Yamaha bearings and seals, front and rear brake master cylinder kits.
Brake banjos from chevotalandcruiser on eBay.
NAPA copper brake banjo washers.
For the painted parts:
Flecto Varathane
Flood Penetrol
NAPA Crossfire CH254 alkyd hardener
Rustoleum Satin Black
Whew! What a ride!
.
Comment