my $0.02
If the fault lies with the Contractor, I'd say he's responsible for replacing the system at his own cost. If fault lies in the design of it, the Engineer is at fault. Either way, I don't see how you'd be forced to soak up the expense when you were up front and vocal about the constraints surrounding the situation. Start calling people, and start ruffling feathers!
If the fault lies with the Contractor, I'd say he's responsible for replacing the system at his own cost. If fault lies in the design of it, the Engineer is at fault. Either way, I don't see how you'd be forced to soak up the expense when you were up front and vocal about the constraints surrounding the situation. Start calling people, and start ruffling feathers!
Comment