Okay, okay . . . hear me out for a second before you stone me to death. My engine currently sits in my basement hung from the joists above awaiting parts and paint. Valve lash has been set, therefore no-more movement of the crank is anticipated prior to engine installation next month. I wanted to empty the engine and middle drive while the engine was out, so I could replace the clutch springs and loosen some bolts that May/May not have oil behind them, and then re-fill after engine installation. Maxiumum time empty would be a month. Maybe this sounds like a bad idea as I type this


Comment