Another note on my progress of installing the 79 Special engine in my 78....yesterday after 8 hours I had the engine in and bracketed, the carbs in, the headers installed. The 1st 2 hours of the job was spent getting the engine at the right hight and correct attitude for sliding it sideways, this was done by using the motorcycle jack and blocking it just to give enough clearence for the engine pan. I had put two pieces of wood strapped to the frame to help hold the engine once in place...to move it sideways I gave it a shove part way into the frame then spread my chest on top of the bikes frame and lifted with both arms hoisting and moving it sideways......but its in.
Bruce
Bruce
Comment